understand the applications for Room Pressurization and Fume Hood Control and are able to use it in projects
are familiar with the necessary working steps for an efficient engineering and commissioning of Room Pressurization and Fume Hood Control projects
know the possible topologies and limits with Room Pressurization and Fume Hood Control
Type
Face-to-face training
Duration
1.5 days
Language
de, en, fr, nl
Target Group
Engineers, which want to carry out the engineering and the commissioning of Lab projects by using ABT Site (Automation Building Tool) with configurable applications.
Content
Application concept
Overview hardware
Overview applications
Overview Topologies
VAV damper: Different types
Configuration of different strategies for Room Pressurization
Configuration of Fume Hoods
Engineering and commissioning workflow
Limits
Prerequisites
Completion of training courses:
Building Products Portfolio Overview (e-learning)
DESIGO DXR2 Room Automation
Practical experience with at least 3 projects with ABT Site
Basic domain knowledge of Room Pressurization and Fume Hood Control