Print page

SIMATIC BATCH Operatortraining (ST-PCS7BOP)

  • Description
  • Dates and Registration
  • Learning Path

Prerequisites

  •  
    • Basic knowledge of electrical engineering, control and feedback control systems and process control engineering.

Type

Face-to-face training

Duration

2.5 days

Language

de
 
© Siemens AG 2009 - 2025 -
Corporate Information | Privacy Policy | Terms of Use | Digital ID